TurboDodge.com MarketPlace Shelby Registry Contact Us

Advertisement - Remove these ads today by clicking here.
 

Go Back   TurboDodge.Com - Turbo Dodge forum for Turbo Mopars, Shelbys, Daytona, SRT-4, PT Cruiser, Omni and more! > Turbo Dodge Technical Chat > FAQ Section

FAQ Section Turbo Dodge FAQ section with answers to the questions we've all asked before.

Reply
 
LinkBack Thread Tools

Old 12-29-2007, 02:44 PM   #1
Head Stud Installation - Work In Progress  
Attentive Forum Admin
 
moparfwdsleeper's Avatar
 
Join Date: Dec 2006
Location: Oklahoma

My Ride: 87 CSX & 85 GLH
Engine: 2.2TII & 2.5N/A
Induct: Turbo
1/4: 0.000

Posts: 9,001
Feedback: (29)
Images: 166
How To: ARP Head Stud Installment
Author: moparfwdsleeper

To learn history and see some of the methods they use to stay the leading automotive fastner company please visit: ARP Homepage

You will need to use a torque tightening sequence(image below). This sequence is to be used for each step.
  • When installing new fasteners you should also chase out the threads to remove and straighten any slightly damaged threads. A tap or a head bolts with 4 slots cut into the bolt to act as a tap. Once chased the studs can be installed.
  • Assuming you are using the supplied ARP Moly Assembly Lubricant. Coat the threads of the stud you are to install into the block. Tighten the studs into place by hand, getting them finger tight.
  • After stud installation give the block deck a good cleaning! Once the deck is cleaned install headgasket(I recommend using copper sealant on other sides of the headgasket to insure a quality seal, Cometic will need this).
  • Once the headgasket is in place slide the cylinder head down the studs. Once cylinder head is in place apply ARP Moly Lubricant to the threads and both sides of the washers(DO NOT mix factory washers with ARP washers, use one or the other).
  • Place all the head stud nuts into place(do this by hand, finger tight). Once these steps are completed you will need your torque wrench.
    Step One: Torque nuts down to 30ft/lbs
    Step Two: Torque nuts down to 45ft/lbs
    Step Three: Torque nuts down to 55ft/lbs
    Step Four: Torque nuts down to 65ft/lbs
    Step Five: Torque nuts down to 65ft/lbs
    Some member's prefer and use 70/75 sometimes 80ft/lbs. This is your call, i'd start with 5ft/lbs more then I list above if you deseire 70-80ft/lbs.
  • Once the studs have been torqued down to ARP specs, start the engine and let idel to normal operation tempatures. Once the desired tempature is reach shut off the engine and let cool(overnight is best, and recommended).
  • When engine is cooled remove the valve cover and double check torque on each stud.
    This will insure that the studs have streched into place, your torque is where it needs to be, and that the headgasket is properly sealed.

    Not always needed but after a few heat cycles i'd suggest double checking your torque to reinsure the headgasket lives a long trouble free life.

Last edited by moparfwdsleeper : 01-18-2008 at 12:19 AM.
moparfwdsleeper is offline  
Reply With Quote
Reply



Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

» Quick Nav
- Home
- Classifieds
- Timeslips
- Gallery
- Vendors
-- Directory
- Tech Articles
- Donate
Sponsors
remove ads

Powered by vBadvanced CMPS v3.0.1
Don Omar | Personal Loans | The eBay Song | Cheap Loan | Mortgages


Powered by vBulletin® Version 3.6.10
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
SEO by vBSEO 3.1.0

Page generated in 0.37933 seconds with 13 queries